Proposal Drafter
A 10-page proposal that used to take 4-8 hours of an AE's week ships in 12 minutes — pulled from the CRM, the discovery call, and your win library.
The problem
AEs spend 4-8 hours per proposal copy-pasting from old decks, hunting down the right case study, and rebuilding pricing tables in Google Slides — usually the night before the deal needs to move forward. The result is generic collateral that doesn't reflect what was actually said in discovery, mismatched ROI numbers from the deal, and a 24-72 hour delay that lets stalled deals stall harder. Win-rate and proposal-cycle-time both suffer, and your top reps spend the most time on the lowest-leverage work.
Proposal cycle time + late-stage win rate
Proposal turnaround from 4-8 hours down to under 15 minutes; 8-15% lift in proposal-to-close win rate from in-context personalization
Forrester sales productivity benchmarks; Gong State of Sales 2024
Integrates with
How it works
Agent · Proposal Drafter
·Salesforce deal record loaded
Salesforce · Opportunity
Vector Logistics
RevOps platform · 280 seats
Decision criteria
Salesforce-native
Close target
May 31
Gong · discovery quote
“We need to cut proposal cycle from a week to under a day.”
Vector Logistics · Proposal.gdoc
1. Cover letter
2. Executive summary
3. Scope of work
4. Pricing tier
5. ROI model
6. Social proof
7. Terms
8. Next steps
Integrates with
Related agents